Monday 19 August 2013

INS VIKRAMADITYA

Vikra.jpg
INS Vikramaditya leaves Sevmash shipyard for trials
Career (India)
Name:INS Vikramaditya
Namesake:Vikramāditya
Builder:Black Sea Shipyard, Mykolayiv, Ukraine
Cost:$ 2.35 Billion[1]
Laid down:December 1978
Launched:April 17, 1982
Commissioned:October 2013 (expected)
Status:Sea Trials
General characteristics
Class & type:Modified Kiev class
Type:Aircraft carrier
Displacement:45,400 tons of loaded displacement[2][3]
Length:283 metres (928 ft) (overall)
Beam:51 metres (167 ft)
Draught:10.2 metres (33 ft)
Propulsion:4 shaft geared steam turbines, 140,000 hp
Speed:32 knots (59 km/h)
Range:4,000 nautical miles (7,400 km)[4]
Endurance:13,500 nautical miles (25,000 km) at 18 knots (33 km/h)[5]
Crew:1,400[6]
Armament:8 CADS-N-1 Kashtan CIWS guns
Aircraft carried: 10 helicopters, possible mix of:

No comments:

Post a Comment