Monday 19 August 2013

Designing of INS vikramaditya

The ship will be operated in a STOBAR configuration, with a 14.3° bow ski-jump ramp and three arrestor wires on the stern of the angled deck. This will allow the operation of MiG-29K and Sea Harrier aircraft. The maximum take-off length for the MiG-29K on Vikramaditya will be between 160–180 metres.
An added advantage of the Admiral Gorshkov platform is its superstructure profile that has the potential to accommodate powerful planar or phased array radar systems with the “billboard style” antennae, which was first observed on the United States Navy's USS Long Beach, along with extensive command and control facilities to conduct an aerial campaign. The ship is also projected to be equipped with a robust combination of air defence weaponry, such as a SAM and/or a CIWS.
Kamov Ka-31 "Helix" are to be based on the INS Vikramaditya in an airborne early warning role.
The hull design is based on the earlier Admiral Gorshkov, launched in 1982, but it will be larger with a full load displacement. The conversion plans for the aircraft carrier involve all the armament, including the P-500 Bazalt cruise missile launchers and the four Antey Kinzhal surface-to-air missile launchers fitted on the front, to be removed to make way for a 14.3º bow ski-jump. Two restraining stands will also be fitted, allowing combat aircraft to reach full power before making a ski jump-assisted short take-off. The ability to launch only one aircraft at a time might prove to be a hindrance. Under the modernisation plan, the 20-ton capacity elevator beside the ship's island superstructure will remain unchanged, but the aft lift will be enlarged and its lift capacity increased to 30 tons. Three arresting gears would be fitted on the aft part of the angled deck. Navigation and carrier-landing aids would be refitted to support fixed-wing STOBAR (Short Take-Off But Arrested Recovery) operations including the LAK optical-landing system.
Artist concept of the Vikramaditya operating as a STOBAR carrier
The eight boilers are being removed and converted to take diesel fuel instead of furnace fuel oil and modern oil-water separators as well as a sewage treatment plant are being incorporated to meet international standards. She is also being fitted with six new Italian-made Wärtsilä 1.5 MW diesel generators, a Global Marine communications system, Sperry Bridgemaster navigation radar, a new telephone exchange, new data link and an IFF Mk XI system. Hotel services are being improved with new water-producing plants as well as York International refrigeration and air conditioning. A new galley is being installed together with improved domestic services and accommodation for 10 female officers.
Though the official expected life span of the ship is 20 years, experts suggest it could actually be a minimum of 30 years from the time of commissioning. On completion of the modernisation, over 70 percent of the ship and her equipment will be new and the remainder will have been refurbished.

No comments:

Post a Comment