Monday, 19 August 2013

Designing of INS vikramaditya

The ship will be operated in a STOBAR configuration, with a 14.3° bow ski-jump ramp and three arrestor wires on the stern of the angled deck. This will allow the operation of MiG-29K and Sea Harrier aircraft. The maximum take-off length for the MiG-29K on Vikramaditya will be between 160–180 metres.
An added advantage of the Admiral Gorshkov platform is its superstructure profile that has the potential to accommodate powerful planar or phased array radar systems with the “billboard style” antennae, which was first observed on the United States Navy's USS Long Beach, along with extensive command and control facilities to conduct an aerial campaign. The ship is also projected to be equipped with a robust combination of air defence weaponry, such as a SAM and/or a CIWS.
Kamov Ka-31 "Helix" are to be based on the INS Vikramaditya in an airborne early warning role.
The hull design is based on the earlier Admiral Gorshkov, launched in 1982, but it will be larger with a full load displacement. The conversion plans for the aircraft carrier involve all the armament, including the P-500 Bazalt cruise missile launchers and the four Antey Kinzhal surface-to-air missile launchers fitted on the front, to be removed to make way for a 14.3º bow ski-jump. Two restraining stands will also be fitted, allowing combat aircraft to reach full power before making a ski jump-assisted short take-off. The ability to launch only one aircraft at a time might prove to be a hindrance. Under the modernisation plan, the 20-ton capacity elevator beside the ship's island superstructure will remain unchanged, but the aft lift will be enlarged and its lift capacity increased to 30 tons. Three arresting gears would be fitted on the aft part of the angled deck. Navigation and carrier-landing aids would be refitted to support fixed-wing STOBAR (Short Take-Off But Arrested Recovery) operations including the LAK optical-landing system.
Artist concept of the Vikramaditya operating as a STOBAR carrier
The eight boilers are being removed and converted to take diesel fuel instead of furnace fuel oil and modern oil-water separators as well as a sewage treatment plant are being incorporated to meet international standards. She is also being fitted with six new Italian-made Wärtsilä 1.5 MW diesel generators, a Global Marine communications system, Sperry Bridgemaster navigation radar, a new telephone exchange, new data link and an IFF Mk XI system. Hotel services are being improved with new water-producing plants as well as York International refrigeration and air conditioning. A new galley is being installed together with improved domestic services and accommodation for 10 female officers.
Though the official expected life span of the ship is 20 years, experts suggest it could actually be a minimum of 30 years from the time of commissioning. On completion of the modernisation, over 70 percent of the ship and her equipment will be new and the remainder will have been refurbished.

INS VIKRAMADITYA

Vikra.jpg
INS Vikramaditya leaves Sevmash shipyard for trials
Career (India)
Name:INS Vikramaditya
Namesake:Vikramāditya
Builder:Black Sea Shipyard, Mykolayiv, Ukraine
Cost:$ 2.35 Billion[1]
Laid down:December 1978
Launched:April 17, 1982
Commissioned:October 2013 (expected)
Status:Sea Trials
General characteristics
Class & type:Modified Kiev class
Type:Aircraft carrier
Displacement:45,400 tons of loaded displacement[2][3]
Length:283 metres (928 ft) (overall)
Beam:51 metres (167 ft)
Draught:10.2 metres (33 ft)
Propulsion:4 shaft geared steam turbines, 140,000 hp
Speed:32 knots (59 km/h)
Range:4,000 nautical miles (7,400 km)[4]
Endurance:13,500 nautical miles (25,000 km) at 18 knots (33 km/h)[5]
Crew:1,400[6]
Armament:8 CADS-N-1 Kashtan CIWS guns
Aircraft carried: 10 helicopters, possible mix of:

Engine of LCA TEJAS

General Electric F404-IN20 engine for the eight pre-production LSP aircraft and two naval prototypes

Initially, it was decided to equip the prototype aircraft with the General Electric F404-GE-F2J3 afterburning turbofan engine. Simultaneously, in 1986, a parallel programme to develop an indigenous powerplant was also launched. Led by the Gas Turbine Research Establishment, the GTRE GTX-35VS, named "Kaveri", was expected to replace the F404 on all production aircraft. However, progress in the Kaveri development programme was slowed by technical difficulties.
Development snags with the Kaveri resulted in the 2003 decision to procure the uprated F404-GE-IN20 engine for the eight pre-production LSP aircraft and two naval prototypes. General Electric was awarded a US$105 million contract in 2004 for development engineering and production of 17 -IN20 engines, delivery of which began in 2006. The F404-GE-IN20 was trial-installed on the Tejas and the engine generated more than 19,000 pounds (85 kN) uninstalled thrust and completed 330 hours of Accelerated Mission testing, equivalent of 1,000 hours of flight operation. In 2007, an additional 24 F404-IN20 afterburning engines were ordered to power the first operational squadron of Tejas fighters.[26]
In mid-2004, the Kaveri failed its high-altitude tests in Russia, ending the last hopes of introducing it with the first production Tejas aircraft.[N 6] In February 2006, the ADA awarded a contract to the French aircraft engine company Snecma for technical assistance in working out the Kaveri's problems.[7] The Kaveri engine based on Snecma’s new core, an uprated derivative of the M88-2 engine that powers the French Rafale fighter, providing 83–85 kilonewtons (kN) of maximum thrust was being considered a third option by DRDO. This led the IAF to object that since Snecma had already developed the core of the engine, the DRDO will not be participating in any joint development but merely providing Snecma with an indigenous stamp.[27]
In 2008, it was announced that the Kaveri would not be ready in time for the Tejas, and that an in-production powerplant would have to be selected[28] in the 95 to 100 kilonewton (kN) (21,000–23,000 lbf) range to allow the aircraft to perform combat maneuvers with optimal weapons load. The contenders were the Eurojet EJ200 and the General Electric F414.[29] IAF sources said that the airframe will have to be redesigned to accommodate the heavier engine, which is to take up to three-four years.[30]
After evaluation and acceptance of the technical offer provided by both Eurojet and GE Aviation, the commercial quotes were compared in detail and GE Aviation was declared as the lowest bidder. The deal will cover purchase of 99 GE F414 engines. The initial batch will be supplied by GE and the remainder will be manufactured in India under a transfer of technology arrangement.[

HAL TEJAS

Tejas
HAL Tejas
RoleMultirole fighter
National originIndia
ManufacturerHindustan Aeronautics Limited (HAL)
DesignerAeronautical Development Agency
First flight4 January 2001
StatusIn production
Primary usersIndian Air Force
Indian Navy
Number built13 (prototypes and LSP aircraft)
Program costUS$1.2 billion
 US$31.09 million (Naval version)


The HAL Tejas (Hindi pronunciation:  is a multirole light fighter developed by India. It is a tailless, compound delta-wing design powered by a single engine. It came from the Light Combat Aircraft (LCA) programme, which began in the 1980s to replace India's ageing MiG-21 fighters. Later, the LCA was officially named "Tejas",meaning "Radiance" by then Prime Minister Atal Bihari Vajpayee.
The Tejas has a pure delta wing configuration, with no tailplanes or foreplanes, and a single dorsal fin. It integrates technologies such as relaxed static stability, fly-by-wire flight control system, multi-mode radar, integrated digital avionics system, composite material structures, and a flat rated engine.
The Tejas is the second supersonic fighter developed indigenously by Hindustan Aeronautics Limited after the HAL Marut. The Indian Air Force (IAF) is reported to have a requirement for 200 single-seat and 20 two-seat conversion trainers, while the Indian Navy may order up to 40 single-seaters to replace its Sea Harrier FRS.51 and Harrier T.60. The Tejas was cleared in January 2011 for use by Indian Air Force pilots. It is to reach the second of three levels of operational clearance in November 2013.

Friday, 16 August 2013

Engines of PAK FA

PAK FA compressor stall at MAKS-2011.

On its first flights, the PAK FA was expected to use a pair of conventional Saturn 117S engines, but a new engine 117 (AL-41F1) powered its first flight. The new engine features a digital control system (FADEC), and is reportedly capable of producing 33,000 lbs (147 kN) of thrust in afterburner, has a dry weight of 1420 kilogram and a thrust to weight ratio of 10.5:1.
According to Sukhoi director Mikhail Pogosyan, the 117 (AL-41F1) is a new fifth generation engine built specifically for the PAK-FA. Pogosyan has clarified that claims of the use of an older engine are incorrect. Though the specifics of the new engine remain classified, information provided has included: increased engine thrust by 2.5 tonnes over the AL-31 engine, a reduction in engine weight by 150 kilograms (330 lb). These changes allow the aircraft to supercruise, sustaining supersonic flight speeds without using afterburners. Mikhail Pogosyan further mentioned that this engine (117) meets the Russian Air Force's requirements and will be installed in production PAK-FA aircraft.
The engine generates a larger thrust and has a complex automation system, to facilitate flight modes such as maneuverability. It is expected that each engine will be able to independently vector its thrust upwards, downward or side to side. Vectoring one engine up with the other one down can produce a twisting force, which would enable the PAK FA to be the first fifth generation fighter with full 3-D thrust vectoring along all three aircraft axes: pitch, yaw and roll. These engines will incorporate infrared and RCS reduction measures.
There is little information about the new engine of T-50. According to preliminary facts, the engine will have increased thrust and fuel efficiency as compared to AL-41F1. Allegedly, the powerplant will have a thrust of about 107 kN in cruise mode and 176 kN in full afterburner mode.

Design of PAK FA

 

Prototype T-50 in flight
Although most information about the PAK FA is classified, sources within in the Russian Air Force and Defense Ministry have openly stated that it features stealth technology and has the capability to supercruise,and incorporate advanced avionics such as an Active Electronically Scanned Array (AESA) radar and an artificial intelligence system. It is to be outfitted with the next generation of air-to-air, air-to-surface, and air-to-ship missiles.
Video from the PAK FA's first flight shows that it has no conventional rudders; its vertical tails are fully movable. This special tail fin design is mechanically similar to V-tails used by the Northrop YF-23 in 1990s, but is supplemented by dedicated horizontal stabilators (as on the F-22). The T-50 has wing leading-edge devices above the jet engine intakes that may pose a challenge for signature control.
Composites are used extensively on the T-50 and comprise 25% of its weight and almost 70% of the outer surface.It is estimated that titanium alloy content of the fuselage is 75%. Sukhoi's concern for minimizing radar cross-section (RCS) and drag is also shown by the provision of two tandem main weapons bays in the centre fuselage, between the engine nacelles. Each is estimated to be between 4.9-5.1 m long. The main bays are augmented by bulged, triangular-section bays at the wing root.
The Moskovsky Komsomolets reported that the T-50 has been designed to be more maneuverable than the F-22 Raptor, at the cost of making it less stealthy than the F-22. One of the design elements that have such an effect is the Leading Edge Vortex Controller (LEVCON).

Cockpit

Life support systems will enable pilots to sustain 9 g in maneuvers. New pressure suits will allow safe ejection at altitudes of up to 23 km.

Stealth

Russian sources indicate the PAK FA lacks the very-low-observable (VLO) stealth of the F-22. Instead, reducing observability with composite materials, aerodynamic configuration, and engine signature reduction measures to achieve low (but not very-low) levels of radar, optic and infrared signatures.Carlo Kopp has said that once the PAK FA is fully developed into a stealthy design, it should be a rough match for the F-35 in low observability, but aerodynamically superior.Sources claim that the PAK FA may incorporate "Plasma stealth" although no solid evidence of this has been shown.

Armament

The PAK FA has a reported maximum weapons load of 7,500 kg.It has an apparent provision for a cannon (most likely GSh-301), and could possibly carry two 30 mm cannons. The PAK FA has two internal bays estimated at 4.6-4.7 metres by 1-1.1 metres.The expected initial armaments include Kh-35UE (AS-20 "Kayak"), Kh-38ME, Kh-58UShKE (AS-11 "Kilter"), and RVV-MD (AA-11 "Archer") missiles.
Two Izdeliye 810 Extended beyond visual range missiles per weapons bay. Multiple Izdeliye 180 / K77M beyond visual range missiles. K74 and K30 within visual range missiles can also be carried. Two KH38M or KH58 USHK air-to-ground missiles per weapons bay. Multiple 250–500 kg precision guided bombs per weapons bay, with a maximum of 10 bombs in internal bays. Other possible loads include one 1,500 kg bomb per weapons bay or two 400 km+ range anti-AWACS weapons (such as the RVV-BD) on external hardpoints.
PAK FA chief designer Alexander Davydenko has said that there is a possibility of the installation of BrahMos supersonic missile on the PAK FA and its FGFA derivative. However, it is unclear how these missiles will be installed, though it can be one or two missiles only due to heavy weight of the BrahMos
PAK FA T-50
RoleStealth multirole fighter
National originRussia
ManufacturerSukhoi
First flight29 January 2010
Introduction2016
StatusTest flight/pre-production
Primary usersRussian Air Force
Russian Navy
Number built5 prototype
Program costUS$8–10 billion (est.)
Unit costT-50: US$50+ million
FGFA: US$100 million
The Sukhoi PAK FA is a twin-engine jet fighter being developed by Sukhoi for the Russian Air Force. The Sukhoi T-50 is the prototype for PAK FA.The PAK FA is one of only a handful of stealth jet programs worldwide.
The PAK FA, a fifth generation jet fighter, is intended to be the successor to the MiG-29 and Su-27 in the Russian inventory and serve as the basis of the Sukhoi/HAL FGFA being developed with India. The T-50 prototype performed its first flight 29 January 2010.
The Russian Defence Ministry will purchase the first 10 evaluation example aircraft after 2012 and then 60 production standard aircraft after 2016.The first batch of fighters will be delivered with current technology engines. The PAK-FA is expected to have a service life of about 30–35 years